Indoor and open swimming pool in Kędzierzyn-Koźle

Go back

Building type

A complex of outdoor and indoor swimming pools with a sauna.

Description

The investment involves the construction of a covered swimming pool hall with cloakroom facilities, a didactic room and a saunarium, as well as outdoor pools with a small cloakroom building. The complex will be complemented by a wet and dry playground, a beach volleyball court, and a four-track slide.

The swimming pool basin is designed as a reinforced concrete, other internal and external basins made of stainless steel.

In the hall of indoor swimming pools, a large-area pneumatic skylight made of ETFE foil was designed to provide users with the opportunity to sunbathe inside the hall.

Dimensions

  • Usable area of rebuild part: 3 709,80 m2
  • Volume of the rebuild part: 20 165,00 m3

Construction

Under construction.

BMZ stage 2 – construction status at 31/01/2019

Construction status [31.01.2019] Currently, works are being carried out in the area of ​​the indirect foundation of the “D” segment – Warehouse. The General Contractor mainly carries out works related to the ground foundation piles.

Read more

BMZ2 – completion of design works

The end of the project! Completion of works related to the releasing a final project for the extension of an industrial plant at ul. Albert Einstein 9 in Gliwice for the company BMZ Poland. Already with a building permit!

Read more