News

Go back
18.03.2016

Completion of the design work on the project – alteration and extension of the Swimming Pool complex in Radomsko

The project involves alteration and extension of the existing indoor swimming pool building and the accompanying infrastructure.This is a one-storey pool building with two-storey office and service part (gym with facilities is located on the ground floor ).

The indoor swimming pool was designed as a simple, compact form with rhythmic division of façades and windows. The building was covered with one roof. The existing office building was, for the optical contrast, incorporated into the pool complex.To make the pool more attractive to the users, at the west façade, outdoor pools connected to those inside the building were designed.

Similar news

News list

This time the training with DYNAMO was completed by architects

The project involves alteration and extension of the existing indoor swimming pool building and the accompanying infrastructure.This is a one-storey pool building with two-storey office and service part (gym with facilities is located on the ground floor ). The indoor swimming pool was designed as a simple, compact form with rhythmic division of façades and windows. […]

Read more

Next stage of Dynamo training for constructors

The project involves alteration and extension of the existing indoor swimming pool building and the accompanying infrastructure.This is a one-storey pool building with two-storey office and service part (gym with facilities is located on the ground floor ). The indoor swimming pool was designed as a simple, compact form with rhythmic division of façades and windows. […]

Read more

Production and storage hall for KET Poland Sp. z o.o. in Zabrze

The project involves alteration and extension of the existing indoor swimming pool building and the accompanying infrastructure.This is a one-storey pool building with two-storey office and service part (gym with facilities is located on the ground floor ). The indoor swimming pool was designed as a simple, compact form with rhythmic division of façades and windows. […]

Read more

Advanced Training – Advance Steel Program

The project involves alteration and extension of the existing indoor swimming pool building and the accompanying infrastructure.This is a one-storey pool building with two-storey office and service part (gym with facilities is located on the ground floor ). The indoor swimming pool was designed as a simple, compact form with rhythmic division of façades and windows. […]

Read more

By using the site you agree to the use of cookies, some may already be stored in your browser. More information can be found at: privacy policy. I agree