The proposed investment assumes construction of production and warehouse hall as supplementation of the existing buildings on the premises of Purmo Group Poland Sp. z o.o. in Rybnik.
Architectural solutions are consistent with the existing architectural and spatial order of the industrial environment.
The production and warehouse hall, due to the continuation of the spatial arrangement of the hall standing next to it, was designed by us in a two-nave system.
The production and warehouse hall building was designed in a mixed construction: a gable roof in a system
of steel (lattice) girders supported on reinforced concrete columns, covered with trapezoidal sheet metal with mineral wool insulation and PVC roofing foil.
The building has a simple shape and through the use of the same finishing materials as on the existing buildings, it will fit harmoniously into its surroundings.
All newly designed work rooms have natural daylight.