Rebuilding of a production and storage hall / Kobierzyce

Go back

Rebuilding of a production and storage hall with production technology and technical infrastructure at Danfoss Power Solutions Sp. o.o. in Kobierzyce

Usable area of the rebuilt hall – part E1 (PU): 9 398 m2
Usable area of the rebuilt hall – parts E0 and E2 (PU): 18,250 m2
TOTAL usable area of the rebuilt hall: 27 648 m2

Volume of the rebuilt hall – part E1 (PU): 134 850 m3
Volume of the rebuilt hall – parts E0 and E2 (PU): 230 818 m3
TOTAL volume of the rebuilt hall: 365 668 m3

Next stage of Dynamo training for constructors

The next stage was a training course for our design engineers on the topic of ” Creating tools to streamline and automate design work in the field of reinforcement of monolithic and prefabricated reinforced concrete structures, and building coordination models in Dynamo for Revit”.

Read more

By using the site you agree to the use of cookies, some may already be stored in your browser. More information can be found at: privacy policy. I agree