Pro-ecological PKP Intercity / Wroclaw

Go back

Investment

Our office’s project, commissioned by General Contractor Mostostal Warszawa SA, was already nearing completion last year.

” The automatic car wash will be a year-round facility used for the external washing of trains. It will be equipped with a sewage treatment plant with a closed circuit of process water, allowing the wash water to be reused several times. The wash hall will be approximately 200 metres long and will be equipped with self-propelled portals with brushes and nozzles along the track line. Photovoltaic panels will be installed on the roof of the car wash technical room to produce electricity for the building’s own use. The hall will be equipped with a rainwater harvesting system and a station to protect the rolling stock from icing” .

Source: Kurier Kolejowy

More information

The construction of the washing facility for the railway depots has come to an end. The formalities will soon be completed. For more information, please CLICK HERE.

Figures

Building area             2 025 m2
Total area                    2 025 m2
Usable area                 1 900 m2
Volume                        14 611 m3
Site development           493 m2

 

Next stage of Dynamo training for constructors

The next stage was a training course for our design engineers on the topic of ” Creating tools to streamline and automate design work in the field of reinforcement of monolithic and prefabricated reinforced concrete structures, and building coordination models in Dynamo for Revit”.