The project involves alteration and extension of the existing indoor swimming pool building and the accompanying infrastructure.
This is a one-storey pool building with two-storey office and service part (gym with facilities is located on the ground floor ).
The indoor swimming pool was designed as a simple, compact form with rhythmic division of façades and windows. The building was covered with one roof. The existing office building was, for the optical contrast, incorporated into the pool complex.
To make the pool more attractive to the users, at the west façade, outdoor pools connected to those inside the building were designed.